The tamper (3) must be set to rest lightly over the entire length of the wear strip (1). Then adjust the spring steel bar (2) on the metering gate by means of the screw (4) from the rear of the screed until there is a gap of 0.5 to 1 mm between the tamper and the spring steel bar. By removing screws (6) and fitting various small shims (5), the metering gate should be aligned so that the spring steel bar (2) is at least parallel to the tamper or is preferably slightly inclined towards the front.
Finally, recheck the gap between the tamper and the spring steel bar and correct it if necessary.